Portsmouth Water installs huge wall at Havant Thicket reservoir

Date:

A major engineering milestone has been reached on what is set to become the UK’s first new reservoir in more than three decades.

Portsmouth Water said teams at Havant Thicket Reservoir installed a 20‑tonne steel cut‑off wall during a continuous 72‑hour operation at the start of the year.

The wall, which is 13m (43ft) high and 9m (29ft) wide, was built on site before being lifted into a deep trench using a 100‑tonne crane.

Read more about the work here.

Share post:

Subscribe

Popular

More like this
Related

My Jewish deli is not a political battleground

I am the owner of Michael’s Deli in Brookline,...

NFL Benefited the Colts With 2026 Travel Schedule

<!--qv q:id=6w q:key=vcaa:The Indianapolis Colts have a much more...

Live updates: China’s Xi warns Trump on Taiwan at Beijing summit

China would prefer not to take military action against...

Pick your EA SPORTS Player of the Season

Eight nominees but only one can win. Who gets...